Sample Record
Owner Lab
- CT D06 - Bakersfield Field Laboratory
DIME Sample ID 2023-05-16-32
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 994632 DEA: 061E6004 EFIS: 0622000067 |
---|---|
DIST-CO-RTE-PM | 06-KER-166-9.0/24.6 |
Award Date | 03/07/2023 |
Closeout Date | 02/26/2024 |
Work Description | Not set |
Location Description | FOR CONSTRUCTION ON STATE HIGHWAY IN KERN COUNTY NEAR MARICOPA FROM 4.0 MILES EAST OF BASIC SCHOOL ROAD TO ROUTE 166/99 SEPARATION |
QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
Sample Taken Date | 05/16/2023 | Sample Unique Key | 32 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/19/2023 |
Sample type | Acceptance | A brief description of the sample | recycle shoulder backing material |
The quantity of what the sample constitutes | 1 bag shoulder backing recycling material | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Andy | Last name of sampler or witnessed by | Grewal |
Title of sampler | Inspector | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Not Provided | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Job Site Windrow | |
Where the material sample would have been placed if not sampled |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-05-16-32-1 CTM 202-November 2011 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-1E6004_37011_230517 | 05/19/2023 | 2023-05-16-32-1 | Info |
DIME Test ID: 2023-05-16-32-2 CTM 217-June 2011 (Verified)