Sample Record
Owner Lab
- Myers and Sons Construction
DIME Sample ID 2023-02-22-78
Project Information
Project Identifiers | Project ID: 993279 DEA: 010E0904 EFIS: 0113000123 |
---|---|
DIST-CO-RTE-PM | 01-MEN-20-33.3/34.4 |
Award Date | 05/06/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT NEW BRIDGE, REMOVE TWO BRIDGES, EARTHWORK AND PAVING. (Bridge No. 10-0310) |
Location Description | MENDOCINO COUNTY NEAR UKIAH FROM 0.3 MILE WEST OF RUSSIAN RIVER BRIDGE AND OVERHEAD TO 0.3 MILE EAST OF COUNTY ROAD 144 |
QA Service Level | 1 (Verified on 10/04/2021) |
Sample Information
Sample Taken Date | 02/22/2023 | Sample Unique Key | 78 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/23/2023 |
Sample type | Quality Control | A brief description of the sample | 4x8 cylinders |
The quantity of what the sample constitutes | 90CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | David | Last name of sampler or witnessed by | Santoscoy |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | NorCal | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 10-0310 | |
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 718034A |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 43573 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Back of truck chute | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
No results found. |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
2023.02.22_Abutment8.Foundations | 05/16/2023 | Info |