Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2023-03-27-43

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Sample Information

Sample Taken Date03/27/2023 Sample Unique Key43
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/05/2023
Sample typeQuality Assurance A brief description of the sampleHRC Couplers
The quantity of what the sample constitutes4 From where was the sample collectedManufacturer
First name of sampler or witnessed byJeff Last name of sampler or witnessed byKramer
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHRC Cascade Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCascade
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#11 Coupler ModelHRC 500-510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)74123596 58047320 05 Rebar Heat Number(s)007223
Rebar Size 2 Coupler Unique IDTP-17-03

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-03-27-43-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)rmacias, CT HQ - Sacramento Structural Materials Testing Laboratory04/06/2023rmacias
Yes
04/07/2023Ok Necking
2023-03-27-43-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)rmacias, CT HQ - Sacramento Structural Materials Testing Laboratory04/06/2023rmacias
Yes
04/07/2023Ok Necking
2023-03-27-43-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)rmacias, CT HQ - Sacramento Structural Materials Testing Laboratory04/06/2023rmacias
Yes
04/07/2023Ok Necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-03-27-43-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-03-27-43-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-03-27-43-3 CTM 670-December 2013 (Verified)