Sample Record

Owner Lab

  • CT D12 - Huntington Beach Field Laboratory

DIME Sample ID 2023-03-06-14

Project Information

Project IdentifiersProject ID: 214951
DEA: 120K0234
EFIS: 1214000100
DIST-CO-RTE-PM12-ORA-5-17.1/18.9
Award Date09/23/2020
Closeout DateNot set
Work DescriptionSouth County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS.
Location DescriptionORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING
QA Service Level1 (Verified on 10/01/2020)

Sample Information

Sample Taken Date03/06/2023 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing03/09/2023
Sample typeRecertification A brief description of the sample3/4 HMA-A
The quantity of what the sample constitutes16 boxes of 3/4 HMA-A, 4 bags of Agg, 3 bags of RAP, 4 cans of oil, 1 can of antistrip From where was the sample collectedManufacturer
First name of sampler or witnessed byDavid Last name of sampler or witnessed byNguyen
Title of sampler Telephone number of sampler
Laboratory sample identification23-0187 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAAA-Irvine Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments