Sample Record

Owner Lab

  • CT D04 - Petaluma Field Laboratory

DIME Sample ID 2023-02-10-51

Project Information

Project IdentifiersProject ID: 215486
DEA: 040A0204
EFIS: 0400000129
DIST-CO-RTE-PM04-SON-1-15-15.7
Award DateNot set
Closeout DateNot set
Work DescriptionConstruct roadway and bridge with structural concrete and CIDH piling
Location DescriptionDistrict-County-Route-Post Mile: 04-Son-1-R15.0/R15.7
QA Service Level1 (Verified on 04/08/2022)

Sample Information

Sample Taken Date02/10/2023 Sample Unique Key51
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/10/2023
Sample typeQuality Assurance A brief description of the sample3/4 HMA
The quantity of what the sample constitutes2 boxes From where was the sample collectedJob Site
First name of sampler or witnessed byCody Last name of sampler or witnessed byBrown
Title of samplerInspector Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBoDean Santa Rosa Transportation Laboratory (TL) Number101339
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number2 HMA Mix NumberD04 JMF 22 011

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-02-10-51-1THIS TEST HAS BEEN SUPERSEDED.
AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Anthony Valdez, CT D04 - Petaluma Field Laboratory02/13/2023Glenn Cea
Yes
03/03/2023THIS TEST HAS BEEN SUPERSEDED.
lot 1 sublot 2 of 3/4" HMA with RAP from Bodean plant.
2023-02-10-51-2AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)Anthony Valdez, CT D04 - Petaluma Field Laboratory02/13/2023Jose Ibarra-Roman
Yes
03/23/2023lot 1 sublot 2 of 3/4" HMA with RAP from Bodean plant.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-02-10-51-1 AASHTO T308-10 (Verified)
DIME Test ID: 2023-02-10-51-2 AASHTO T308-10 (Verified)