Sample Record
Owner Lab
- RMA Group - Rancho Cordova
DIME Sample ID 2023-01-20-30
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 993183 DEA: 031H2704 EFIS: 0316000082 |
---|---|
DIST-CO-RTE-PM | 03-YUB-70-R11.2/13.5 |
Award Date | 10/14/2021 |
Closeout Date | Not set |
Work Description | UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER. |
Location Description | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD |
QA Service Level | 1 (Verified on 08/16/2021) |
Sample Information
Sample Taken Date | 01/20/2023 | Sample Unique Key | 30 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/20/2023 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 Cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Bishop |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Cemex | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1442005 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 0 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | approach slab feather river NB | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-01-20-30-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2023-01-20-30-2 CTM 504-June 2010 (Verified)
DIME Test ID: 2023-01-20-30-3 CTM 518-June 2010 (Verified)
DIME Test ID: 2023-01-20-30-4 ASTM C143-20 (Verified)
DIME Test ID: 2023-01-20-30-5 CTM 521-June 2020 (Verified)
DIME Test ID: 2023-01-20-30-6 CTM 521-June 2020 (Verified)
DIME Test ID: 2023-01-20-30-7 CTM 521-June 2020 (Verified)