Sample Record
Owner Lab
- Pavement Engineers
DIME Sample ID 2022-10-07-67
Project Information
Project Identifiers | Project ID: 993333 DEA: 04264724 EFIS: 0419000068 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-R20.8/27.1 |
Award Date | 04/26/2022 |
Closeout Date | Not set |
Work Description | CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL. |
Location Description | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE |
QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
Sample Taken Date | 10/07/2022 | Sample Unique Key | 67 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/08/2022 |
Sample type | Quality Control | A brief description of the sample | SL-4201CG |
The quantity of what the sample constitutes | 27 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Irwin | Last name of sampler or witnessed by | McMath |
Title of sampler | Field Technician | Telephone number of sampler | |
Laboratory sample identification | S22-061 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Shamrock | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | highway median |
Material Information
Material Type | Concrete | The concrete mix design number | SL4201CG |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 428843 | |
Concrete batch plant | Shamrock Materials | The fabricator/manufacturer designation for the sample | SL4201CG |
A detailed description of where the material sample was collected | back of truck | Where the material sample would have been placed if not sampled | highway median |
From Lot No. | Bag Lot No. |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2022-10-07-67-1 | THIS TEST HAS BEEN SUPERSEDED. ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | Michelle Holub, Pavement Engineers | 10/07/2022 | Michelle Holub | Yes | 12/08/2022 | THIS TEST HAS BEEN SUPERSEDED. | |
2022-10-07-67-2 | THIS TEST HAS BEEN SUPERSEDED. ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | Michelle Holub, Pavement Engineers | 10/07/2022 | Michelle Holub | Yes | 12/08/2022 | THIS TEST HAS BEEN SUPERSEDED. | |
2022-10-07-67-3 | ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | Cameron Carlson, Pavement Engineers | 10/14/2022 | Michelle Holub | Yes | 12/09/2022 | ||
2022-10-07-67-4 | ASTM C39-21: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | Michelle Holub, Pavement Engineers | 11/04/2022 | Michelle Holub | Yes | 12/09/2022 | ||
2022-10-07-67-5 | ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete | Irwin McMath, Pavement Engineers | 10/07/2022 | Michelle Holub | Yes | 12/13/2022 | ||
2022-10-07-67-6 | ASTM C138-17a: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete | Irwin McMath, Pavement Engineers | 10/07/2022 | Michelle Holub | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-10-07-67-1 ASTM C39-21 (Verified)
DIME Test ID: 2022-10-07-67-2 ASTM C39-21 (Verified)
DIME Test ID: 2022-10-07-67-3 ASTM C39-21 (Verified)
DIME Test ID: 2022-10-07-67-4 ASTM C39-21 (Verified)
DIME Test ID: 2022-10-07-67-5 ASTM C143-20 (Verified)
DIME Test ID: 2022-10-07-67-6 ASTM C138-17a