Sample Record

Owner Lab

  • CT D06 - Millbrook Field Laboratory

DIME Sample ID 2022-11-01-38

Project Information

Project IdentifiersProject ID: 215348
DEA: 060U4204
EFIS: 0616000004
DIST-CO-RTE-PM06-FRE-99-R4.9/11.6
Award Date02/25/2021
Closeout DateNot set
Work DescriptionCONSTRUCT CRCP, PLACE HMA, AND ROADWAY EXCAVATION.
Location DescriptionFRESNO COUNTY IN AND NEAR SELMA AND FOWLER FROM MCCALL AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF MERCED STREET UNDERCROSSING
QA Service Level1 (Verified on 12/07/2020)

Sample Information

Sample Taken Date11/01/2022 Sample Unique Key38
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/01/2022
Sample typeQuality Assurance A brief description of the sampleNative Soil
The quantity of what the sample constitutes200 SQYD From where was the sample collectedJob Site
First name of sampler or witnessed byallen Last name of sampler or witnessed byoliver
Title of sampler Telephone number of sampler5594175341
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedNative Subgrade
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments