Sample Record

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

DIME Sample ID 2015-06-11-7

Project Information

Project IdentifiersProject ID: 208682
DEA: 083401U4
EFIS: 0800000609
DIST-CO-RTE-PM08-SBD-138,138-6.2/6.4,2.3/R15.2
Award Date09/10/2014
Closeout Date06/23/2021
Work DescriptionWIDEN TO 4 LNS FR BEEKLEY RD TO JCT 15, ADD 1 LN EB FR PHELAN RD TO
Location DescriptionSAN BERNARDINO COUNTY ON ROUTE 138 NEAR PHELAN FROM 0.6 MILE WEST OF PHELAN ROAD TO THE JUNCTION OF ROUTE 15 AND ON ROUTE 2 FROM 0.1 MILE NORTH OF WILD HORSE CANYON ROAD TO ROUTE 138
QA Service Level1 (Verified on 03/11/2013)

Sample Information

Sample Taken Date06/11/2015 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/17/2015
Sample typeQuality Control A brief description of the sample6x12
The quantity of what the sample constitutes2 From where was the sample collectedJob Site
First name of sampler or witnessed bysilvia Last name of sampler or witnessed bystrancer
Title of samplerasr Telephone number of samplerUnknown
Laboratory sample identification908-01 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility namejob Transportation Laboratory (TL) Number001
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifiersheep creek bridge
Structure namepier 2 and 3 footings

Material Information

Material TypeConcrete The concrete mix design numbernp
The truck number from where the sample was collected180 The batch plant ticket number from where the sample was collectednp
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedchute Where the material sample would have been placed if not sampledUnknown
From Lot No.Not set Bag Lot No.Not set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2015-06-11-7-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory07/09/2015Matthew Clayton
Yes
07/09/2015

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2015-06-11-7-1 CTM 521-November 2014 (Verified)