Sample Record
Owner Labs
- CT D04 - Oakland (YBITS2) Field Laboratory
- CT HQ - Sacramento Concrete Testing Laboratory
DIME Sample ID 2015-05-22-9
Project Information
Project Identifiers | Project ID: 7285 DEA: 040120T4 EFIS: 0400000027 |
---|---|
DIST-CO-RTE-PM | 04-SF-80-12.6/13.9 |
Award Date | 11/27/2012 |
Closeout Date | Not set |
Work Description | CONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES |
Location Description | THE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL |
QA Service Level | 1 (Verified on 10/29/2012) |
Sample Information
Sample Taken Date | 05/22/2015 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/10/2015 |
Sample type | Department Acceptance | A brief description of the sample | Bike Path Span 4 Beam 13 thru 16 |
The quantity of what the sample constitutes | 45 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Brandon Young | Last name of sampler or witnessed by | Young |
Title of sampler | ASR | Telephone number of sampler | 510 858 7727 |
Laboratory sample identification | Sample A | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Central Concrete | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Unknown |
Structure name | Unknown |
Material Information
Material Type | Concrete | The concrete mix design number | D101C5E1 |
---|---|---|---|
The truck number from where the sample was collected | 3 | The batch plant ticket number from where the sample was collected | 18023861 |
Concrete batch plant | Peralta | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | Near E1 | Where the material sample would have been placed if not sampled | Bike Path 13 thru 16 |
From Lot No. | Not set | Bag Lot No. | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2015-05-22-9-1 ASTM C39-10 (Verified)