Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2022-09-09-47

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215188
DEA: 080F5434
EFIS: 0817000239
Permit Numbers: 0823NMC0369
DIST-CO-RTE-PM08-RIV-I-15,SR-91-6.1-7.6
Award Date03/11/2020
Closeout Date06/05/2024
Work DescriptionI-15 ELC: 15/91 Express Lanes Connector Project (ELC)
Location DescriptionJunction of I-15 and SR-91 in Corona, CA
QA Service Level1 (Verified on 09/16/2020)

Sample Information

Sample Taken Date09/09/2022 Sample Unique Key47
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/12/2022
Sample typeQuality Assurance A brief description of the sample#8 HRC 500/510 Couplers
The quantity of what the sample constitutes150 Couplers From where was the sample collectedJob Site
First name of sampler or witnessed byEric Last name of sampler or witnessed byDiaz
Title of samplerQva inspector Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Transportation Laboratory (TL) NumberC2108-M
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#8 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)79001741 Rebar Heat Number(s)6034092
Rebar Size 2 Coupler Unique IDTP-17-03

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-09-09-47-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory09/15/2022spaine
Yes
09/15/2022ok necking
2022-09-09-47-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory09/15/2022spaine
Yes
09/15/2022ok necking
2022-09-09-47-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory09/15/2022spaine
Yes
09/15/2022ok necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-09-09-47-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-09-47-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-09-09-47-3 CTM 670-December 2013 (Verified)