Sample Record

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

DIME Sample ID 2015-05-14-2

Project Information

Project IdentifiersProject ID: 209139
DEA: 071170U4
EFIS: 0700000085
DIST-CO-RTE-PM07-LA-10-33.2/37.2
Award Date02/10/2014
Closeout Date03/01/2022
Work DescriptionCONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE WEST OF PUENTE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF HOLLENBECK STREET UNDERCROSSING
QA Service Level1 (Verified on 05/06/2014)

Sample Information

Sample Taken Date05/14/2015 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/15/2015
Sample typeQuality Control A brief description of the sample6X12
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed bySAL Last name of sampler or witnessed byVALDOVINOS
Title of samplerASR Telephone number of samplerUnknown
Laboratory sample identification882-13 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJOB Transportation Laboratory (TL) Number1624513
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierWEST OF PUENTE AVE UC to EAST OF HOLLENBECK
Structure nameSW 1847 FROM 1857 7312 1850 9622

Material Information

Material TypeConcrete The concrete mix design numberCM5645
The truck number from where the sample was collected160 The batch plant ticket number from where the sample was collected101049830
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleUnknown
A detailed description of where the material sample was collectedTRUCK Where the material sample would have been placed if not sampledNot set
From Lot No.Not set Bag Lot No.Not set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2015-05-14-2-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory05/28/2015Matthew Clayton
Yes
05/28/2015
2015-05-14-2-2CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete CylindersMatthew Clayton, CT D08 - Fontana Southern Regional Laboratory06/11/2015Matthew Clayton
Yes
06/11/2015

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2015-05-14-2-1 CTM 521-November 2014 (Verified)
DIME Test ID: 2015-05-14-2-2 CTM 521-November 2014 (Verified)