Sample Record
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
DIME Sample ID 2022-08-29-31
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 993253 DEA: 033F0604 EFIS: 0312000052 |
---|---|
DIST-CO-RTE-PM | 03-GLE-162-76.3/78.6 |
Award Date | 02/02/2022 |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 04/08/2022) |
Sample Information
Sample Taken Date | 08/29/2022 | Sample Unique Key | 31 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/31/2022 |
Sample type | Quality Assurance | A brief description of the sample | #11 HRC 500/510 Couplers |
The quantity of what the sample constitutes | 2 Lots of Couplers | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Monil | Last name of sampler or witnessed by | Singh |
Title of sampler | ASR | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC | Transportation Laboratory (TL) Number | F5-P28 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
Rebar Size | #11 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 79001079, 74124730 | Rebar Heat Number(s) | 4119738 |
Rebar Size 2 | Coupler Unique ID | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-08-29-31-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-08-29-31-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-08-29-31-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-08-29-31-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-08-29-31-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2022-08-29-31-6 CTM 670-December 2013 (Verified)