Sample Record
Owner Lab
- CT HQ - Sacramento Asphalt Binder Laboratory
DIME Sample ID 2022-08-19-21
Project Information
Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
---|---|
DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
Award Date | 05/01/2019 |
Closeout Date | 02/22/2024 |
Work Description | Not set |
Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
Sample Taken Date | 08/19/2022 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/23/2022 |
Sample type | Department Acceptance | A brief description of the sample | Tack Coat |
The quantity of what the sample constitutes | 1 Oil Jug | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Robert | Last name of sampler or witnessed by | Sears |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | 2022-08-19-13 | |
The fabricator/manufacturer/facility name | Northwest Pacific Oil | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphaltic Emulsion | Emulsion Grade | SS-1h |
---|---|---|---|
Lot Number | Not set | Sub Lot | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-08-19-21-1 AASHTO T59-16 (Verified)