Sample Record
Owner Lab
- Blackburn Consulting
DIME Sample ID 2022-06-10-34
Project Information
Project Identifiers | Project ID: 213411 DEA: 030H10U4 EFIS: 0317000246 |
---|---|
DIST-CO-RTE-PM | 03-SAC-5-9.7/24.9 |
Award Date | 05/01/2019 |
Closeout Date | 02/22/2024 |
Work Description | Not set |
Location Description | Construction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct |
QA Service Level | 1 (Verified on 07/19/2019) |
Sample Information
Sample Taken Date | 06/10/2022 | Sample Unique Key | 34 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 06/10/2022 |
Sample type | Quality Assurance | A brief description of the sample | 1/2" RHMA-O |
The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Sergio | Last name of sampler or witnessed by | Tostado |
Title of sampler | Materials Tester | Telephone number of sampler | 8315884727 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Granite Bradshaw | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L1SL14 | Structure unique identifier | |
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | OGFC |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | 1 |
Sublot number | 14 | HMA Mix Number | Not set |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
No results found. |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |