Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2022-03-22-8
Project Information
Project Identifiers | Project ID: 214951 DEA: 120K0234 EFIS: 1214000100 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-17.1/18.9 |
Award Date | 09/23/2020 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 3 - El Toro/Alicia) WIDEN FREEWAY AND BRIDGES, RECONSTRUCT BRIDGE AND WALLS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO, LAGUNA HILLS, LAGUNA WOODS AND LAKE FOREST FROM 0.4 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING TO 0.2 MILE NORTH OF EL TORO ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/01/2020) |
Sample Information
Sample Taken Date | 03/22/2022 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/24/2022 |
Sample type | Verification | A brief description of the sample | PSUE 3/4" RWMA-G-SP, 0.40% Evotherm |
The quantity of what the sample constitutes | 2 Bags Of Aggregate | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | AAA | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0188G-22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | All American Asphalt-Irvine | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | 108835 | A detailed description of where the material sample was collected | Belt Cut at AAA-Irvine |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-03-22-8-1 AASHTO T27-14 (Verified)
DIME Test ID: 2022-03-22-8-2 AASHTO T84-14 (Verified)
DIME Test ID: 2022-03-22-8-3 AASHTO T85-13 (Verified)
DIME Test ID: 2022-03-22-8-4 AASHTO T96-02r10 (Verified)
DIME Test ID: 2022-03-22-8-5 AASHTO T176-08 (Verified)
DIME Test ID: 2022-03-22-8-6 AASHTO T304-11 (Verified)
DIME Test ID: 2022-03-22-8-7 AASHTO T335-09r13 (Verified)
DIME Test ID: 2022-03-22-8-8 ASTM D4791-10 (Verified)