Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2022-03-14-28
Project Information
Project Identifiers | Project ID: 215148 DEA: 081E8404 EFIS: 0814000113 |
---|---|
DIST-CO-RTE-PM | 08-RIV,SBD-62-R6.7/9.2,0.0/15.1,29.3/33.6 |
Award Date | 12/11/2020 |
Closeout Date | 03/01/2023 |
Work Description | REPLACE ROADWAY WITH RHMA-G AND HMA. |
Location Description | IN RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR YUCCA VALLEY AND IN TWENTYNINE PALMS FROM 0.2 MILE NORTH OF INDIAN CANYON DRIVE TO 0.6 MILE WEST OF UTAH TRAIL |
QA Service Level | 1 (Verified on 03/18/2021) |
Sample Information
Sample Taken Date | 03/14/2022 | Sample Unique Key | 28 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/18/2022 |
Sample type | Verification | A brief description of the sample | PSUE 3/4" RHMA-G-SP 0.5% LAS |
The quantity of what the sample constitutes | 4 Bags Aggregate | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Matich Corporation | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0172G-22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Matich Plant Cabazon | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0008, 91-35-0040 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | CHP 68E | A detailed description of where the material sample was collected | Belt Cut at Matich Cabazon |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-03-14-28-1 AASHTO T27-14 (Verified)
DIME Test ID: 2022-03-14-28-2 AASHTO T84-14 (Verified)
DIME Test ID: 2022-03-14-28-3 AASHTO T85-13 (Verified)
DIME Test ID: 2022-03-14-28-4 AASHTO T96-02r10 (Verified)
DIME Test ID: 2022-03-14-28-5 AASHTO T176-08 (Verified)
DIME Test ID: 2022-03-14-28-6 AASHTO T304-11 (Verified)
DIME Test ID: 2022-03-14-28-7 AASHTO T335-09r13 (Verified)
DIME Test ID: 2022-03-14-28-8 ASTM D4791-10 (Verified)