Sample Record
Owner Lab
- RMA Group - Rancho Cordova
DIME Sample ID 2022-02-02-35
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 214114 DEA: 040A5394 EFIS: 0418000244 |
---|---|
DIST-CO-RTE-PM | 04-SOL-80,12-11.4/12.8, 2.1/2.8 |
Award Date | Not set |
Closeout Date | 02/24/2023 |
Work Description | Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. |
Location Description | I-80/I-680/Route 12 Interchange |
QA Service Level | 1 (Verified on 04/23/2019) |
Sample Information
Sample Taken Date | 02/02/2022 | Sample Unique Key | 35 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/02/2022 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Erik | Last name of sampler or witnessed by | Haagensen |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Syar | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1615674 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 30063793 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | South West side of bridge footing about one and a half feet from bottom | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2022-02-02-35-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2022-02-02-35-2 ASTM C143-20 (Verified)
DIME Test ID: 2022-02-02-35-3 CTM 521-June 2020 (Verified)
DIME Test ID: 2022-02-02-35-4 CTM 521-June 2020 (Verified)