Sample Record

Owner Lab

  • RMA Group - Rancho Cordova

DIME Sample ID 2021-09-01-66

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214702
DEA: 030F2864
EFIS: 0320000123
DIST-CO-RTE-PM03-SAC-99-7.92 / 8.4
Award Date06/24/2020
Closeout Date11/28/2023
Work DescriptionRemove and replace Consumnes River and Consumnes River Overflow bridge
Location DescriptionSacramento County
QA Service Level1 (Verified on 04/20/2020)

Sample Information

Sample Taken Date09/01/2021 Sample Unique Key66
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/01/2021
Sample typeQuality Control A brief description of the sampleconcrete
The quantity of what the sample constitutes100 cy From where was the sample collectedJob Site
First name of sampler or witnessed byJose Last name of sampler or witnessed byMurillo
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameKnife River Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number201
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected1680752
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedRiver Abutment 1 End Backwall Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-09-01-66-1CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteJOSE MURILLO, RMA Group - Rancho Cordova09/01/2021Mathew Lowrance
Yes
04/07/2022
2021-09-01-66-2CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodJOSE MURILLO, RMA Group - Rancho Cordova09/01/2021Mathew Lowrance
Yes
04/07/2022
2021-09-01-66-3CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteJOSE MURILLO, RMA Group - Rancho Cordova09/01/2021Mathew Lowrance
Yes
04/07/2022
2021-09-01-66-4ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement ConcreteJOSE MURILLO, RMA Group - Rancho Cordova09/01/2021Mathew Lowrance
Yes
04/07/2022
2021-09-01-66-5CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTodd Strait, RMA Group - Rancho Cordova09/29/2021Mathew Lowrance
Yes
04/07/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-09-01-66-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2021-09-01-66-2 CTM 504-June 2010 (Verified)
DIME Test ID: 2021-09-01-66-3 CTM 518-June 2010 (Verified)
DIME Test ID: 2021-09-01-66-4 ASTM C143-20 (Verified)
DIME Test ID: 2021-09-01-66-5 CTM 521-June 2020 (Verified)