Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2021-11-22-11

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215093
DEA: 101C2804
EFIS: 1014000134
DIST-CO-RTE-PM10-SJ-99-30.9/31.3
Award Date10/21/2020
Closeout Date08/30/2023
Work DescriptionRAISED BRIDGES, REALIGN RAMPS AND CONSTRUCT AUXILIARY LANE.
Location DescriptionSAN JOAQUIN COUNTY IN LODI FROM 0.4 MILE SOUTH OF ROUTE 12/99 SEPARATION TO 0.3 MILE SOUTH OF TURNER ROAD OVERCROSSING
QA Service Level1 (Verified on 08/21/2020)

Sample Information

Sample Taken Date11/22/2021 Sample Unique Key11
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/24/2021
Sample typeQuality Assurance A brief description of the sample#5 Zap Screwlok Type 2 couplers
The quantity of what the sample constitutes150 Couplers From where was the sample collectedJob Site
First name of sampler or witnessed byunknown Last name of sampler or witnessed byunknown
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMillennium Reinforcement Transportation Laboratory (TL) NumberC710255
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerVinton Steel
Coupler ManufacturerBarSplice Intermediate Assembler or Fabricator
Rebar Size#5 Coupler ModelZap Screwlok Type 2
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)73118353 Rebar Heat Number(s)2111400
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-11-22-11-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory11/29/2021bewing
Yes
11/30/2021Service Splice
2021-11-22-11-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory11/29/2021bewing
Yes
11/30/2021Service Splice
2021-11-22-11-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory11/29/2021bewing
Yes
11/30/2021Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-11-22-11-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-11-22-11-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-11-22-11-3 CTM 670-December 2013 (Verified)