Sample Record

Owner Lab

  • CT D08 - Fontana Field Testing Laboratory

DIME Sample ID 2021-11-08-32

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215612
DEA: 081L6904
EFIS: 0820000139
DIST-CO-RTE-PM08-SBD-10,60-9.9/R24.2,R0.0/R4.6
Award Date05/06/2021
Closeout Date10/13/2022
Work DescriptionINDIVIDUAL SLAB REPLACEMENT.
Location DescriptionSAN BERNARDINO COUNTY ON ROUTE 10 FROM ROUTE 15 TO ROUTE 215 AND ON ROUTE 60 FROM 0.1 MILE EAST OF RESERVOIR STREET UNDERCROSSING TO EUCLID AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/23/2021)

Sample Information

Sample Taken Date11/08/2021 Sample Unique Key32
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/09/2021
Sample typeQuality Assurance A brief description of the samplePCC Rapid set beams
The quantity of what the sample constitutes3 beams From where was the sample collectedJob Site
First name of sampler or witnessed byQC Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification31RA,31RB,31RC Linked DIME Sample ID
The fabricator/manufacturer/facility nameMyers and Sons Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number800-3RSC
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedTTI
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedOn Job Site at Concrete Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-11-08-32-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, I. Najjar, CT D08 - Fontana Field Testing Laboratory11/11/2021Rhea Osorio
Yes
11/22/2021
2021-11-08-32-2CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, I. Najjar, CT D08 - Fontana Field Testing Laboratory11/11/2021Rhea Osorio
Yes
11/22/2021
2021-11-08-32-3CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcreteM. Warde, I. Najjar, CT D08 - Fontana Field Testing Laboratory11/11/2021Rhea Osorio
Yes
11/22/2021

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-11-08-32-1 CTM 524-March 2013 (Verified)
DIME Test ID: 2021-11-08-32-2 CTM 524-March 2013 (Verified)
DIME Test ID: 2021-11-08-32-3 CTM 524-March 2013 (Verified)