Sample Record

Owner Lab

  • CT HQ - QASI Bay Area Field Office

DIME Sample ID 2021-11-17-1

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215396
DEA: 042K8404
EFIS: 0417000031
DIST-CO-RTE-PM04-SOL-29,80-0.0,0.8/1.6
Award Date03/26/2021
Closeout Date02/16/2024
Work DescriptionHMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR.
Location DescriptionSOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING
QA Service Level1 (Verified on 01/25/2021)

Sample Information

Sample Taken Date11/17/2021 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/18/2021
Sample typeQuality Assurance A brief description of the sampleErico Lenton Stander Couplers
The quantity of what the sample constitutes1 lot of 16 ea From where was the sample collectedFabricator
First name of sampler or witnessed byRyan Last name of sampler or witnessed byParr
Title of sampler Telephone number of sampler5103855910
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameConco Reinforcing Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormB373-114-21 Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingAuthorization Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler ManufacturerEaton Intermediate Assembler or Fabricator
Rebar Size#8 Coupler ModelErico Standard
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)Heat- A212123 Lot- L9901 Rebar Heat Number(s)58048516
Rebar Size 2 8 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-11-17-1-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory11/22/2021fsaylor
Yes
11/22/2021Service Splice
2021-11-17-1-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)<None>, CT HQ - Sacramento Structural Materials Testing Laboratory11/22/2021<None>
Yes
11/22/2021Service Splice
2021-11-17-1-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory11/22/2021fsaylor
Yes
11/22/2021Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-11-17-1-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-11-17-1-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-11-17-1-3 CTM 670-December 2013 (Verified)