Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2021-11-04-6

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date11/04/2021 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/04/2021
Sample typeAcceptance A brief description of the sampleAB
The quantity of what the sample constitutes627 CY From where was the sample collectedJob Site
First name of sampler or witnessed byRosauro Last name of sampler or witnessed byNogoy
Title of samplerTE Civil Telephone number of sampler2137939321
Laboratory sample identification21-2716 Linked DIME Sample ID
The fabricator/manufacturer/facility nameSecurity Paving company Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFrom various locations at subgrade
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-11-04-6-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesRosauro Nogoy, CT D07 - Materials Field Laboratory, Unit 195311/04/2021Rosauro Nogoy
No
Info
2021-11-04-6-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesRosauro Nogoy, CT D07 - Materials Field Laboratory, Unit 195311/04/2021Rosauro Nogoy
No
Info

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-11-04-6-1 CTM 231-March 2013
DIME Test ID: 2021-11-04-6-2 CTM 216-June 2011