Sample Record
Owner Lab
- CT HQ - Sacramento Hot Mix Asphalt Laboratory
DIME Sample ID 2021-05-03-56
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 214293 DEA: 060S4604 EFIS: 0615000038 |
---|---|
DIST-CO-RTE-PM | 06-FRE-99-R0.9/R5.0 |
Award Date | 12/05/2019 |
Closeout Date | 05/11/2023 |
Work Description | REPLACE CONCRETE AND ASPHALT PAVEMENT. |
Location Description | FRESNO COUNTY IN AND NEAR KINGSBURG AND SELMA FROM ROUTE 99/201 SEPARATION TO 0.3 MILE SOUTH OF SECOND STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 08/05/2019) |
Sample Information
Sample Taken Date | 05/03/2021 | Sample Unique Key | 56 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/12/2021 |
Sample type | Dispute Resolution | A brief description of the sample | RAP |
The quantity of what the sample constitutes | 1 Bag | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | na | Last name of sampler or witnessed by | na |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMI Fresno | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | c040331 | Structure unique identifier | |
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Plant |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Static | Stockpile Size (tons) | |
Reclaimed Asphalt Pavement Mix Number | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-05-03-56-1 AASHTO T30-19 (Verified)