Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2021-09-18-10

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214572
DEA: 034E62U4
EFIS: 0319000068
DIST-CO-RTE-PM03-ED-50-18.5/24.2
Award Date05/04/2020
Closeout DateNot set
Work DescriptionCONSTRUCT UC, MED BARRIER, DRAINAGE SYSTEMS & HMA OVERLAY.
Location DescriptionEL DORADO COUNTY IN AND NEAR PLACERVILLE FROM MOSQUITO ROAD UNDERCROSSING TO SCHNELL SCHOOL ROAD UNDERCROSSING AND FROM 0.2 MILE WEST OF STILL MEADOW ROAD TO 0.2 MILE EAST OF CARSON ROAD
QA Service Level1 (Verified on 03/18/2020)

Sample Information

Sample Taken Date09/18/2021 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/27/2021
Sample typeQuality Assurance A brief description of the sample#6 HRC 500/510 Couplers
The quantity of what the sample constitutes2 Lots of Couplers From where was the sample collectedJob Site
First name of sampler or witnessed byCassra Last name of sampler or witnessed byBonakdar
Title of samplerASR Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Transportation Laboratory (TL) NumberC788802
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#6 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)NC13204490 034766 Rebar Heat Number(s)6024766
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-09-18-10-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory09/27/2021fsaylor
Yes
09/28/2021OK Necking
2021-09-18-10-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory09/27/2021fsaylor
Yes
09/28/2021OK Necking
2021-09-18-10-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory09/27/2021fsaylor
Yes
09/28/2021OK Necking
2021-09-18-10-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory09/27/2021fsaylor
Yes
09/28/2021OK Necking
2021-09-18-10-5CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory09/27/2021fsaylor
Yes
09/28/2021OK Necking
2021-09-18-10-6CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory09/27/2021fsaylor
Yes
09/28/2021OK Necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-09-18-10-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-09-18-10-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-09-18-10-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-09-18-10-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-09-18-10-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-09-18-10-6 CTM 670-December 2013 (Verified)