Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2021-08-07-6
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 214665 DEA: 081G5504 EFIS: 0816000035 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-R28.9 |
Award Date | 03/09/2021 |
Closeout Date | 01/18/2022 |
Work Description | REPLACE WEIGH-IN-MOTION SYSTEM WITH HIGH SPEED WEIGH-IN-MOTION SYSTEM. |
Location Description | SAN BERNARDINO COUNTY NEAR NEWBERRY SPRINGS AT 3.6 MILES WEST OF HECTOR ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 06/23/2021) |
Sample Information
Sample Taken Date | 08/07/2021 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/03/2021 |
Sample type | Quality Assurance | A brief description of the sample | Concrete Cylinders |
The quantity of what the sample constitutes | 2 Cylinders | From where was the sample collected | Other |
First name of sampler or witnessed by | Larry | Last name of sampler or witnessed by | Francisco |
Title of sampler | TE | Telephone number of sampler | |
Laboratory sample identification | 1034-87B | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Not Provided | Transportation Laboratory (TL) Number | 1034-87B |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | CTS-65-EHI |
---|---|---|---|
The truck number from where the sample was collected | Not Provided | The batch plant ticket number from where the sample was collected | Not Provided |
Concrete batch plant | Not Provided | The fabricator/manufacturer designation for the sample | |
A detailed description of where the material sample was collected | Not Provided | Where the material sample would have been placed if not sampled | I40 PM 28point9 WB Lane 2 |
From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-08-07-6-1 ASTM C39-18 (Verified)