Sample Record
Owner Lab
- Universal Precast Concrete - Redding
DIME Sample ID 2021-08-16-39
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 212775 DEA: 024F2204 EFIS: 0212000073 |
---|---|
DIST-CO-RTE-PM | 02-TRI-3-58.7/61.9 |
Award Date | 02/25/2021 |
Closeout Date | 05/06/2024 |
Work Description | REPLACE STRUCTURAL CONCRETE BRIDGE AND CULVERTS AND PLACE HMA. |
Location Description | TRINITY COUNTY NEAR TRINITY CENTER FROM 58.7 MILES NORTH OF PREACHER MEADOWS ROAD TO 60.7 MILES SOUTH OF EL DORADO WAY |
QA Service Level | 1 (Verified on 01/08/2019) |
Sample Information
Sample Taken Date | 08/16/2021 | Sample Unique Key | 39 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/16/2021 |
Sample type | Quality Control | A brief description of the sample | conc cylinder |
The quantity of what the sample constitutes | 2 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Dan | Last name of sampler or witnessed by | Weippert |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Universal Precast Concrete | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | PC78A0E1 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 001161 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | back of truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-08-16-39-1 ASTM C39-21 (Verified)
DIME Test ID: 2021-08-16-39-2 ASTM C39-21 (Verified)