Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2021-08-09-15

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214402
DEA: 010E7704
EFIS: 0115000009
DIST-CO-RTE-PM01-HUM-101-R17.9/87.8
Award Date01/21/2020
Closeout Date07/21/2023
Work DescriptionSTRENGTHEN 2 BRIDGES.
Location DescriptionHUMBOLDT COUNTY AT SOUTH FORK EEL RIVER AND SEPARATION AND AT ARCATA OVERHEAD
QA Service Level1 (Verified on 09/16/2019)

Sample Information

Sample Taken Date08/09/2021 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/12/2021
Sample typeQuality Assurance A brief description of the sample#7 Barlock D250L Couplers
The quantity of what the sample constitutes72 Couplers From where was the sample collectedJob Site
First name of sampler or witnessed byXavier Last name of sampler or witnessed byCarrillo
Title of samplerASR Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCamblin Steel Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC and Cascade
Coupler ManufacturerDayton Superior Intermediate Assembler or Fabricator
Rebar Size#7 Coupler ModelBarlock D250L
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)A200340 182336 Rebar Heat Number(s)4093000 157521
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-08-09-15-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/12/2021fsaylor
Yes
08/12/2021Service Splice
2021-08-09-15-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/12/2021fsaylor
Yes
08/12/2021Service Splice
2021-08-09-15-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/12/2021fsaylor
Yes
08/12/2021Service Splice
2021-08-09-15-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)fsaylor, CT HQ - Sacramento Structural Materials Testing Laboratory08/12/2021fsaylor
Yes
08/12/2021Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-08-09-15-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-09-15-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-09-15-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-08-09-15-4 CTM 670-December 2013 (Verified)