Sample Record

Owner Lab

  • CT HQ - Sacramento Asphalt Binder Laboratory

DIME Sample ID 2021-07-27-22

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214190
DEA: 024G41U4
EFIS: 0218000047
DIST-CO-RTE-PM02-SIS,SIS-5-Var
Award Date08/26/2019
Closeout Date11/24/2021
Work DescriptionREPLACE REINFORCED CONCRETE BRIDGES & CONSTRUCT RETAINING WALL.
Location DescriptionSHASTA AND SISKIYOU COUNTIES ABOUT 7 MILES NORTH OF POLLARD FLAT FROM 0.8 MILE SOUTH TO 0.7 MILE NORTH OF SIMS ROAD UNDERCROSSING AND FROM 0.6 MILE SOUTH OF CASTLE CRAGS DRIVE UNDERCROSSING TO 0.2 MILE SOUTH OF SOUTH DUNSMUIR UNDERCROSSING
QA Service Level1 (Verified on 07/09/2019)

Sample Information

Sample Taken Date07/27/2021 Sample Unique Key22
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/03/2021
Sample typeAcceptance A brief description of the samplePG 58-34M
The quantity of what the sample constitutes1 OF 2 Cans From where was the sample collectedSource
First name of sampler or witnessed byRandy Last name of sampler or witnessed byBibbins
Title of samplerCGI Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameValero Benicia Transportation Laboratory (TL) Number990947
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-07-27-22-1AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)Harish Thakur, CT HQ - Sacramento Asphalt Binder Laboratory08/10/2021Harish Thakur
Yes
08/12/2021
2021-07-27-22-2AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)Eva Torres, CT HQ - Sacramento Asphalt Binder Laboratory08/10/2021Eva Torres
Yes
08/12/2021
2021-07-27-22-3AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)Eva Torres, CT HQ - Sacramento Asphalt Binder Laboratory08/10/2021Eva Torres
Yes
08/12/2021RTFO
2021-07-27-22-4AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)Eva Torres, CT HQ - Sacramento Asphalt Binder Laboratory08/11/2021Eva Torres
Yes
08/12/2021PAV
2021-07-27-22-5AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)Ruben Macias, CT HQ - Sacramento Asphalt Binder Laboratory08/11/2021Ruben Macias
Yes
08/12/2021
2021-07-27-22-6AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)Eva Torres, CT HQ - Sacramento Asphalt Binder Laboratory08/10/2021Eva Torres
Yes
08/12/2021rtfo+6

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-07-27-22-1 AASHTO T240-17 (Verified)
DIME Test ID: 2021-07-27-22-2 AASHTO T315-20 (Verified)
DIME Test ID: 2021-07-27-22-3 AASHTO T315-20 (Verified)
DIME Test ID: 2021-07-27-22-4 AASHTO T315-20 (Verified)
DIME Test ID: 2021-07-27-22-5 AASHTO T313-19 (Verified)
DIME Test ID: 2021-07-27-22-6 AASHTO T315-20 (Verified)