Sample Record
Owner Lab
- Sequoia Consultants
DIME Sample ID 2021-06-08-38
Project Information
Project Identifiers | Project ID: 215299 DEA: 07260804 EFIS: 0712000104 |
---|---|
DIST-CO-RTE-PM | 07-LA-10,405-16.6/30.1,4.8/8.7 |
Award Date | 01/29/2021 |
Closeout Date | 03/05/2024 |
Work Description | CONSTRUCT GROSS SOLIDS REMOVAL DEVICES, BIOSWALES AND MEDIA FILTERS. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS ON ROUTE 10 0.1 MILE WEST OF SANTA FE AVENUE TO 0.2 MILE WEST OF COGSWELL ROAD UNDERCROSSING AND ON ROUTE 405 0.1 MILE EAST OF CHEERY AVENUE OVERCROSSING TO 0.1 MILE WEST OF SOUTH ALAMEDA STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 04/05/2021) |
Sample Information
Sample Taken Date | 06/08/2021 | Sample Unique Key | 38 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/09/2021 |
Sample type | Quality Control | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Josh | Last name of sampler or witnessed by | Hua |
Title of sampler | Field Technician | Telephone number of sampler | |
Laboratory sample identification | C060821-103 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Associated Ready Mix - Los Angeles | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Austin Vault footing and floor |
Material Information
Material Type | Concrete | The concrete mix design number | 557237 |
---|---|---|---|
The truck number from where the sample was collected | 0601 | The batch plant ticket number from where the sample was collected | 40407708 |
Concrete batch plant | Associated RMC Los Angeles | The fabricator/manufacturer designation for the sample | Mix |
A detailed description of where the material sample was collected | Discharge chute from back of truck | Where the material sample would have been placed if not sampled | footing and floor |
From Lot No. | Bag Lot No. |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2021-06-08-38-1 | CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders | Ruben Jimenez, Sequoia Consultants | 07/06/2021 | Ken Mancebo | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-06-08-38-1 CTM 521-June 2020