Sample Record
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
DIME Sample ID 2021-06-14-27
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
Award Date | 10/22/2020 |
Closeout Date | 12/11/2023 |
Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
QA Service Level | 1 (Verified on 08/24/2020) |
Sample Information
Sample Taken Date | 06/14/2021 | Sample Unique Key | 27 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/22/2021 |
Sample type | Quality Assurance | A brief description of the sample | Erico From savers Service Splice Coupler |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Emilano | Last name of sampler or witnessed by | Bernisen |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC Rebar Erico Lenton | Transportation Laboratory (TL) Number | C7620217 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
Coupler Manufacturer | Erico Lenton | Intermediate Assembler or Fabricator | |
Rebar Size | #6 | Coupler Model | Erico Lenton Form Savers |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | L9783 | Rebar Heat Number(s) | 3103987 |
Rebar Size 2 | Coupler Unique ID | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-06-14-27-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-06-14-27-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-06-14-27-3 CTM 670-December 2013 (Verified)