Sample Record
Owner Lab
- CT HQ - Sacramento Hot Mix Asphalt Laboratory
DIME Sample ID 2021-05-23-2
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 215596 DEA: 061C1604 EFIS: 0621000103 |
---|---|
DIST-CO-RTE-PM | 06-MAD,MAD-99-1.5/7.4 |
Award Date | 03/16/2021 |
Closeout Date | 11/22/2021 |
Work Description | Remove and replace failed pavement on the number 2 lane on both the N and S directions. |
Location Description | Not set |
QA Service Level | 1 (Verified on 03/29/2021) |
Sample Information
Sample Taken Date | 05/23/2021 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/03/2021 |
Sample type | Dispute Resolution | A brief description of the sample | 3/4" RHMA-G PG64-16 |
The quantity of what the sample constitutes | 4 boxes at 350 tons | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | N/A | Last name of sampler or witnessed by | N/A |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Vulcan Materials - Madera | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 1 |
Sublot number | 10 | HMA Mix Number | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-05-23-2-1 AASHTO T308-10 (Verified)
DIME Test ID: 2021-05-23-2-2 AASHTO T209-12 (Verified)
DIME Test ID: 2021-05-23-2-3 AASHTO T275-07r12 (Verified)
DIME Test ID: 2021-05-23-2-4 AASHTO T269-14 (Verified)