Sample Record

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

DIME Sample ID 2021-04-26-13

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214701
DEA: 030F2844
EFIS: 0319000204
DIST-CO-RTE-PM03-SAC-99-7.1/9.4
Award Date05/14/2020
Closeout Date11/27/2023
Work DescriptionConstruct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments
Location DescriptionNot set
QA Service Level1 (Verified on 04/20/2020)

Sample Information

Sample Taken Date04/26/2021 Sample Unique Key13
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/27/2021
Sample typeQuality Assurance A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutes3 cylinders From where was the sample collectedJob Site
First name of sampler or witnessed byJim Last name of sampler or witnessed byN
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) Number197308
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameMcConnell barrier 842

Material Information

Material TypeConcrete The concrete mix design numberUnknown
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected00000000000000000
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedTruck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-04-26-13-1ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete SpecimensMM, CT HQ - Sacramento Concrete Testing Laboratory05/24/2021MM
Yes
05/25/2021

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-04-26-13-1 ASTM C39-10 (Verified)