Sample Record

Owner Lab

  • CT HQ - Sacramento Concrete Testing Laboratory

DIME Sample ID 2021-02-23-15

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215132
DEA: 051M6404
EFIS: 0520000045
DIST-CO-RTE-PM05-SLO-101-37/46, 37.0-46.0
Award Date06/22/2020
Closeout Date08/23/2021
Work DescriptionAtascadero Slab Replacement - replace JPCP with precast pavement panels (Procast)
Location DescriptionUS 101 near Atascadero
QA Service Level1 (Verified on 08/26/2020)

Sample Information

Sample Taken Date02/23/2021 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/03/2021
Sample typeQuality Assurance A brief description of the sampleRapid Setting Concrete
The quantity of what the sample constitutes2 Bags From where was the sample collectedManufacturer
First name of sampler or witnessed byJay Last name of sampler or witnessed byWest
Title of samplerQuality Specialist Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCTS Cement Transportation Laboratory (TL) NumberC013
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeRapid Set ManufacturerCTS Cement
Mix no.3499 Materials ReceivedRapid Set DOT Repair Mix
Lot no.23102231 Batch no.23102231

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-02-23-15-1CONCLP 2-16: Rapid Set Patching MaterialsSpencer Adams, CT HQ - Sacramento Concrete Testing Laboratory04/20/2021Spencer Adams
Yes
04/20/2021

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-02-23-15-1 CONCLP 2-16 (Verified)