Sample Record
Owner Lab
- Pyramid Construction and Aggregates
DIME Sample ID 2020-09-14-43
Project Information
Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 09/14/2020 | Sample Unique Key | 43 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/14/2020 |
Sample type | Quality Control | A brief description of the sample | 3/4" HMA-A Lime |
The quantity of what the sample constitutes | 150 tons | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Matthew | Last name of sampler or witnessed by | Ramos |
Title of sampler | Project Manager | Telephone number of sampler | 760-604-0024 |
Laboratory sample identification | SP-2020 | Linked DIME Sample ID | JMF3512-2021-3-SP-2020 |
The fabricator/manufacturer/facility name | Pyramid Construction and Aggregates Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number | Not set |
JMF Information
HMA Design ID | JMF3512-2021-3-SP-2020 | Date Created | 01/07/2021 |
---|---|---|---|
Submittal | N/A |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2020-09-14-43-1 | AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content) | Matthew Ramos, Pyramid Construction and Aggregates | 09/14/2020 | Archie Abeyta | No | Info | ||
2020-09-14-43-2 | AASHTO T275-07r12: Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Paraffin-Coated Specimens (Bulk Specific Gravity) | Matthew Ramos, Pyramid Construction and Aggregates | 09/14/2020 | Archie Abeyta | No | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2020-09-14-43-1 AASHTO T308-10
DIME Test ID: 2020-09-14-43-2 AASHTO T275-07r12