Sample Record

Owner Lab

  • CT HQ - Sacramento Asphalt Binder Laboratory

DIME Sample ID 2020-06-30-44

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214385
DEA: 024G6104
EFIS: 0214000028
DIST-CO-RTE-PM02-SHA,TRI-3,299-VAR
Award Date11/04/2019
Closeout Date09/28/2021
Work DescriptionHMA, LIGHTING AND BRIDGE RAIL REPLACEMENT.
Location DescriptionSHASTA AND TRINITY COUNTIES AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 09/16/2019)

Sample Information

Sample Taken Date06/30/2020 Sample Unique Key44
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/30/2020
Sample typeAcceptance A brief description of the sampleAsphalt Binder PG 64-16
The quantity of what the sample constitutes3 each Can, #3 TEST (1-3) From where was the sample collectedSource
First name of sampler or witnessed byDevin Last name of sampler or witnessed byOwens
Title of samplerInspector Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameValero - Benicia Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
ModifiedNo Lot number
Sublot number Tank numberNot set
Time of sampleNot set HMA SupplierNot set
Certified Asphalt SupplierNot set MultigradeNot set
Multigrade TypeNot set Asphalt Binder Mix NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2020-06-30-44-1THIS TEST HAS BEEN SUPERSEDED.
AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Ruben Macias, CT HQ - Sacramento Asphalt Binder Laboratory08/05/2020Justin Ellis
Yes
09/23/2020THIS TEST HAS BEEN SUPERSEDED.
2020-06-30-44-2THIS TEST HAS BEEN SUPERSEDED.
AASHTO T51-13: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Sunday Agude, CT HQ - Sacramento Asphalt Binder Laboratory08/07/2020Sunday Agude
Yes
09/23/2020THIS TEST HAS BEEN SUPERSEDED.
2020-06-30-44-3THIS TEST HAS BEEN SUPERSEDED.
AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Eva Torres, CT HQ - Sacramento Asphalt Binder Laboratory08/14/2020Justin Ellis
Yes
08/14/2020THIS TEST HAS BEEN SUPERSEDED.
2020-06-30-44-4THIS TEST HAS BEEN SUPERSEDED.
AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Eva Torres, CT HQ - Sacramento Asphalt Binder Laboratory08/17/2020Justin Ellis
Yes
08/19/2020THIS TEST HAS BEEN SUPERSEDED.
2020-06-30-44-5THIS TEST HAS BEEN SUPERSEDED.
AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Xavier Carrillo, CT HQ - Sacramento Asphalt Binder Laboratory09/01/2020Justin Ellis
Yes
09/02/2020THIS TEST HAS BEEN SUPERSEDED.
2020-06-30-44-6THIS TEST HAS BEEN SUPERSEDED.
AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Sunday Agude, CT HQ - Sacramento Asphalt Binder Laboratory08/03/2020Sunday Agude
Yes
09/23/2020THIS TEST HAS BEEN SUPERSEDED.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-06-30-44-1 AASHTO T240-17 (Verified)
DIME Test ID: 2020-06-30-44-2 AASHTO T51-13 (Verified)
DIME Test ID: 2020-06-30-44-3 AASHTO T315-16 (Verified)
DIME Test ID: 2020-06-30-44-4 AASHTO T315-16 (Verified)
DIME Test ID: 2020-06-30-44-5 AASHTO T315-16 (Verified)
DIME Test ID: 2020-06-30-44-6 AASHTO T313-19 (Verified)