Sample Record
Owner Lab
- CT HQ - QASI Bay Area Field Office
DIME Sample ID 2013-12-26-12005652
Project Information
Project Identifiers | Project ID: 208572 DEA: 100L3304 EFIS: 1000000100 COOP: 10355 Permit Numbers: 1012NMC0508 |
---|---|
DIST-CO-RTE-PM | 10-STA-99-0.0/0.3 |
Award Date | Not set |
Closeout Date | 03/09/2020 |
Work Description | Reconsteuct SR99/Kiernan Interchange |
Location Description | City of Salida, in STA County |
QA Service Level | 1 (Verified on 03/25/2013) |
Sample Information
Sample Taken Date | 12/26/2013 | Sample Unique Key | 12005652 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 12/27/2013 |
Sample type | Informational | A brief description of the sample | Mix Design K6090-621SCC |
The quantity of what the sample constitutes | 2 concrete cylinders | From where was the sample collected | Source |
First name of sampler or witnessed by | Ricardo | Last name of sampler or witnessed by | Medina |
Title of sampler | QA Inspector | Telephone number of sampler | Not set |
Laboratory sample identification | Not set | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | KieCon | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | PCPS Wide Flange Girder No. G2 |
Material Information
Material Type | Concrete | The concrete mix design number | K6090-621SCC |
---|---|---|---|
The truck number from where the sample was collected | Not set | The batch plant ticket number from where the sample was collected | 52729 |
Concrete batch plant | Not set | The fabricator/manufacturer designation for the sample | KieCon |
A detailed description of where the material sample was collected | By formwork at precast plant during pour inspection (Beginning of center of cast) | Where the material sample would have been placed if not sampled | Not set |
From Lot No. | Not set | Bag Lot No. | Not set |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
2013-12-26-12005652-1 | ASTM C39-10: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens | Stanley Mak, CT HQ - QASI Bay Area Field Office | 01/02/2014 | Stanley Mak | No | Stopped test when stress is above design strength 9000 psi to avoid machine overload | Info |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2013-12-26-12005652-1 ASTM C39-10