Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2020-05-08-8
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 213651 DEA: 08388524 EFIS: 0812000124 |
---|---|
DIST-CO-RTE-PM | 08-SBD-330-32.3/32.6,33.4/33.8 |
Award Date | 11/28/2018 |
Closeout Date | 10/23/2020 |
Work Description | REPLACE BRIDGE RAILS AND APPROACH RAILS. |
Location Description | SAN BERNARDINO COUNTY FROM 0.2 MILE SOUTH TO 0.1 MILE NORTH OF CITY CREEK BRIDGE AND FROM 0.3 MILE SOUTH TO 0.1 MILE NORTH OF EAST CITY CREEK BRIDGE |
QA Service Level | 1 (Verified on 02/04/2019) |
Sample Information
Sample Taken Date | 05/08/2020 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/11/2020 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 10 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | soroush | Last name of sampler or witnessed by | mavandadi |
Title of sampler | ASR | Telephone number of sampler | |
Laboratory sample identification | 998-58 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | ROBERTSONS REDLAND | Transportation Laboratory (TL) Number | 995-58 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | East fork city creek Br, stage 2 |
Material Information
Material Type | Concrete | The concrete mix design number | rrm19036 |
---|---|---|---|
The truck number from where the sample was collected | 1978 | The batch plant ticket number from where the sample was collected | 5422968 |
Concrete batch plant | Robertsons Redlands | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | chute | Where the material sample would have been placed if not sampled | Barrier Slab at Abutment 1 |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2020-05-08-8-1 ASTM C39-10 (Verified)