Sample Record
Owner Lab
- Syar Industries, Incorporated
DIME Sample ID 2020-03-13-5
Project Information
Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 03/13/2020 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/13/2020 |
Sample type | Preliminary | A brief description of the sample | 1/2" OGFC-SP WMA PG 58-34M |
The quantity of what the sample constitutes | 780 Pounds | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Cody | Last name of sampler or witnessed by | Brown |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | 314130010-LD_0320 | |
The fabricator/manufacturer/facility name | SYAR Lake Herman Drum | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | OGFC |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | Unknown |
Sublot number | Unknown | HMA Mix Number | Not set |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
No results found. |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |