Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2020-01-30-41

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 209141
DEA: 07215954
EFIS: 0700001835
DIST-CO-RTE-PM07-LA-5-0.0/7.6
Award Date04/24/2014
Closeout Date07/14/2022
Work DescriptionWIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location DescriptionLOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
QA Service Level1 (Verified on 06/02/2014)

Sample Information

Sample Taken Date01/30/2020 Sample Unique Key41
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/31/2020
Sample typeQuality Control A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byDwayne Last name of sampler or witnessed byOvalle
Title of samplerQC Field Technician Telephone number of samplerUnknown
Laboratory sample identificationSet 6 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifier00-0000
Structure nameAbut 2 Approach Slab

Material Information

Material TypeConcrete The concrete mix design numberG3-15-STR-002
The truck number from where the sample was collectedLoad 50 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 6
A detailed description of where the material sample was collectedFloerence Bridge - Abutment 4 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2020-01-30-41-1CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete CylindersAlberto Pineda-Gonzalez, G3 Quality, Incorporated - Cerritos02/07/2020Hysun Lee
Yes
03/05/2020
2020-01-30-41-2CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete CylindersAlberto Pineda-Gonzalez, G3 Quality, Incorporated - Cerritos02/28/2020Hysun Lee
Yes
03/05/2020
2020-01-30-41-3CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement ConcreteDwayne Ovalle, G3 Quality, Incorporated - Cerritos01/30/2020Hysun Lee
Yes
03/05/2020
2020-01-30-41-5CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteDwayne Ovalle, G3 Quality, Incorporated - Cerritos01/30/2020Hysun Lee
Yes
03/05/2020
2020-01-30-41-6CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodDwayne Ovalle, G3 Quality, Incorporated - Cerritos01/30/2020Hysun Lee
Yes
03/05/2020
2020-01-30-41-7CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement ConcreteDwayne Ovalle, G3 Quality, Incorporated - Cerritos01/30/2020Hysun Lee
Yes
03/05/2020

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-01-30-41-1 CTM 521-June 2012 (Verified)
DIME Test ID: 2020-01-30-41-2 CTM 521-June 2012 (Verified)
DIME Test ID: 2020-01-30-41-3 CTM 557-July 2012 (Verified)
DIME Test ID: 2020-01-30-41-5 CTM 518-June 2010 (Verified)
DIME Test ID: 2020-01-30-41-6 CTM 504-June 2010 (Verified)
DIME Test ID: 2020-01-30-41-7 CTM 533-June 2010 (Verified)