Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2020-01-20-4

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date01/20/2020 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing02/03/2020
Sample typeQuality Assurance A brief description of the sampleCoupler
The quantity of what the sample constitutes4 From where was the sample collectedFabricator
First name of sampler or witnessed bySalvador Last name of sampler or witnessed byCORONA
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC BarSplice Transportation Laboratory (TL) NumberC670077
Inspector Lot Number from the Transportation Laboratory (TL) FormNA Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerBarSplice Intermediate Assembler or FabricatorUnknown
Rebar Size7 Coupler ModelZap Screwlok
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)MM18108714 Rebar Heat Number(s)032845
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2020-01-20-4-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/05/2020bewing
Yes
02/06/2020Service Splice
2020-01-20-4-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/05/2020bewing
Yes
02/06/2020Service Splice
2020-01-20-4-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory02/05/2020bewing
Yes
02/06/2020Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2020-01-20-4-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2020-01-20-4-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2020-01-20-4-3 CTM 670-December 2013 (Verified)