Sample Record
Owner Lab
- CT HQ - Sacramento Hot Mix Asphalt Laboratory
DIME Sample ID 2019-03-29-20
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 03/29/2019 | Sample Unique Key | 20 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/23/2019 |
Sample type | Quality Control | A brief description of the sample | 3/4 inch HMA-A w/Lime w/RAP |
The quantity of what the sample constitutes | 8 | From where was the sample collected | Source |
First name of sampler or witnessed by | Mark | Last name of sampler or witnessed by | Huddleston |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Syar Lake Herman | Transportation Laboratory (TL) Number | C816003 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | Unknown |
Sublot number | Unknown | HMA Mix Number | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2019-03-29-20-1 AASHTO T308-10 (Verified)
DIME Test ID: 2019-03-29-20-2 AASHTO T209-12 (Verified)
DIME Test ID: 2019-03-29-20-3 AASHTO T275-07r12 (Verified)