Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2019-11-14-20

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 213724
DEA: 040K8404
EFIS: 0416000148
DIST-CO-RTE-PM04-CC-680-13.9/22.7
Award Date01/23/2019
Closeout Date09/28/2021
Work DescriptionINSTALL FREEWAY SAFETY LIGHTING
Location DescriptionCONTRA COSTA COUNTY AT VARIOUS LOCATIONS FROM OLYMPIC BOULEVARD TO ARTHUR ROAD
QA Service Level1 (Verified on 12/13/2018)

Sample Information

Sample Taken Date11/14/2019 Sample Unique Key20
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/26/2019
Sample typeQuality Assurance A brief description of the sampleA325 Bolts
The quantity of what the sample constitutes17 From where was the sample collectedManufacturer
First name of sampler or witnessed byRyan Last name of sampler or witnessed byParr
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameNucor Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormB373-056-19 Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM3 - Fastener Assembly Rocap Number(s)
Heat Number(s)100894283 100893710 284529 DL18102822 100896088 174930 174295 Nut Mfg. Lot Number(s)414755A 422062A
Washer Mfg. Lot Number(s)D6538 D5066 B8A Bolt SpecificationA325
Bolt Length(s)1.75" 5" Nut SpecificationA563
Washer SpecificationF436 F959 FinishMG
Diameter/Size.75" 1" Bolt Mfg. Lot Number418259A 409440A
Rocap Test Requirement(s) Lubricant Requirements(s)

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2019-11-14-20-1ASTM F606-14a: Standard Test Methods for Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (Proof Load)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory12/02/2019spaine
Yes
12/05/2019Nut Proof Load
2019-11-14-20-2ASTM F606-14a: Standard Test Methods for Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (Proof Load)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory12/02/2019spaine
Yes
12/05/2019Nut Proof Load
2019-11-14-20-3ASTM F606-14a: Standard Test Methods for Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, Direct Tension Indicators, and Rivets (Proof Load with Wedge)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory12/02/2019spaine
Yes
12/05/2019A325 Wedge Tensile
2019-11-14-20-4ASME B1.2-83r01: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Steven Paine, CT HQ - Sacramento Structural Materials Testing Laboratory12/03/2019Steven Paine
Yes
12/05/2019
2019-11-14-20-5ASME B1.2-83r01: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Steven Paine, CT HQ - Sacramento Structural Materials Testing Laboratory12/03/2019Steven Paine
Yes
12/05/2019
2019-11-14-20-6ASME B1.2-83r01: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Steven Paine, CT HQ - Sacramento Structural Materials Testing Laboratory12/03/2019Steven Paine
Yes
12/05/2019
2019-11-14-20-7ASME B1.2-83r01: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Steven Paine, CT HQ - Sacramento Structural Materials Testing Laboratory12/03/2019Steven Paine
Yes
12/05/2019
2019-11-14-20-8ASME B1.2-83r01: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Steven Paine, CT HQ - Sacramento Structural Materials Testing Laboratory12/03/2019Steven Paine
Yes
12/05/2019
2019-11-14-20-9ASME B1.2-83r01: (Ring Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Ring Gage)Steven Paine, CT HQ - Sacramento Structural Materials Testing Laboratory12/03/2019Steven Paine
Yes
12/05/2019
2019-11-14-20-10ASME B1.2-83r01: (Plug Gage) Gages and Gaging for Unified Inch Screw Threads - Errata May 1992 (Plug Gage)Steven Paine, CT HQ - Sacramento Structural Materials Testing Laboratory12/03/2019Steven Paine
Yes
12/05/2019

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-11-14-20-1 ASTM F606-14a (Verified)
DIME Test ID: 2019-11-14-20-2 ASTM F606-14a (Verified)
DIME Test ID: 2019-11-14-20-3 ASTM F606-14a (Verified)
DIME Test ID: 2019-11-14-20-4 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-5 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-6 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-7 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-8 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-9 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-10 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-11 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-12 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-13 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-14 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-15 ASME B1.2-83r01 (Verified)
DIME Test ID: 2019-11-14-20-16 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-17 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-18 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-19 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-20 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-21 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-22 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-23 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-24 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-25 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-26 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-27 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-28 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-29 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-30 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-31 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-32 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-33 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-34 ASTM E18-15 (Verified)
DIME Test ID: 2019-11-14-20-35 ASTM E18-15 (Verified)
DIME Test ID: 2019-11-14-20-36 ASTM E18-15 (Verified)
DIME Test ID: 2019-11-14-20-37 ASTM E18-15 (Verified)
DIME Test ID: 2019-11-14-20-38 ASTM E18-15 (Verified)
DIME Test ID: 2019-11-14-20-39 ASTM E18-15 (Verified)
DIME Test ID: 2019-11-14-20-40 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-41 ASTM B499-14 (Verified)
DIME Test ID: 2019-11-14-20-42 ASTM B499-14 (Verified)