Sample Record
Owner Lab
- CT D08 - Fontana Field Testing Laboratory
DIME Sample ID 2019-11-07-6
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 209694 DEA: 080J0704 EFIS: 0800000282 |
---|---|
DIST-CO-RTE-PM | 08-SBD-215-0.6/1.7 |
Award Date | 10/17/2017 |
Closeout Date | 04/23/2020 |
Work Description | (Alternative Delivery) The CMGC project will reconstruct and improve interchange of I-215 and Barton Road in the City of Grand Terrace, CA. |
Location Description | Grade separation at Intersection of I-215 and Barton Road near Grand Terrace, CA. ? On I-215 between I-10 and SR-60. |
QA Service Level | 1 (Verified on 12/11/2017) |
Sample Information
Sample Taken Date | 11/07/2019 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/08/2019 |
Sample type | Department Acceptance | A brief description of the sample | Concrete beams |
The quantity of what the sample constitutes | 4 Beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Hamid | Last name of sampler or witnessed by | Arjamond |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 28A1,28A2, 28B1, 28B2 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Robertson Riverside | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | 42-xxxx | |
Structure name | Unknown |
Material Information
Material Type | Concrete | The concrete mix design number | SC675B38 |
---|---|---|---|
The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | TT1 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | on jobsite at concrete truck | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2019-11-07-6-1 CTM 523-July 2012 (Verified)
DIME Test ID: 2019-11-07-6-2 CTM 523-July 2012 (Verified)
DIME Test ID: 2019-11-07-6-3 CTM 523-July 2012 (Verified)
DIME Test ID: 2019-11-07-6-4 CTM 523-July 2012 (Verified)