Sample Record
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
DIME Sample ID 2019-11-08-4
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 213750 DEA: 120K0224 EFIS: 1214000097 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-14.5/17.1 |
Award Date | 03/05/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 04/15/2019) |
Sample Information
Sample Taken Date | 11/08/2019 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/12/2019 |
Sample type | Quality Assurance | A brief description of the sample | Flash Welded Rebar Hoops |
The quantity of what the sample constitutes | 110 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Steve | Last name of sampler or witnessed by | Hall |
Title of sampler | CT METS QA INSPECTOR | Telephone number of sampler | 6466327821 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | RKR Steel Welding | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L134-144-19 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Rebar Heat Number(s) | 4087545 |
Hoop Manufacturer Lot Number(s) | 3 | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Size | 6 |
Diameter of Hoop | 3'-6" | Epoxy Coated | No |
Epoxy Coating Color | NA | Rebar Manufacturer | CMC Steel AZ |
Welding Company | RKR Steel Welding | Coating Standards | Uncoated |
Weld Type | Flash Welded |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2019-11-08-4-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-11-08-4-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-11-08-4-3 CTM 670-December 2013 (Verified)