Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2019-09-03-12

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 211260
DEA: 072159U4
EFIS: 0715000160
DIST-CO-RTE-PM07-LA,ORA-5-0.0/1.5, 44.3/44.4
Award Date05/27/2016
Closeout Date08/01/2023
Work DescriptionCONSTRUCT HOV LANES AND MIX FLOW LANES.
Location DescriptionLOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
QA Service Level1 (Verified on 03/16/2016)

Sample Information

Sample Taken Date09/03/2019 Sample Unique Key12
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/04/2019
Sample typeQuality Control A brief description of the sample6x12 Cylinders
The quantity of what the sample constitutes6 From where was the sample collectedJob Site
First name of sampler or witnessed byPrescott Last name of sampler or witnessed byBarnett
Title of samplerQC Field Technician Telephone number of samplerUnknown
Laboratory sample identificationSet 3 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJobsite Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifier00-0000
Structure nameUnknown

Material Information

Material TypeConcrete The concrete mix design numberS72500
The truck number from where the sample was collectedLoad 27 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 3
A detailed description of where the material sample was collectedBridge 53-3058k Stem and Soffit Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2019-09-03-12-1CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete CylindersAlexis Balandra, G3 Quality, Incorporated - Cerritos09/11/2019Hysun Lee
Yes
10/18/2019
2019-09-03-12-2CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete CylindersAndrew Uribe, G3 Quality, Incorporated - Cerritos10/02/2019Hysun Lee
Yes
10/18/2019
2019-09-03-12-3CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete CylindersAlexis Balandra, G3 Quality, Incorporated - Cerritos10/16/2019Hysun Lee
Yes
10/18/2019
2019-09-03-12-4CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement ConcretePrescott Barnett, G3 Quality, Incorporated - Cerritos09/03/2019Hysun Lee
Yes
10/18/2019
2019-09-03-12-5CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodPrescott Barnett, G3 Quality, Incorporated - Cerritos09/03/2019Hysun Lee
Yes
10/18/2019
2019-09-03-12-6CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement ConcretePrescott Barnett, G3 Quality, Incorporated - Cerritos09/03/2019Hysun Lee
Yes
10/18/2019

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-09-03-12-1 CTM 521-June 2012 (Verified)
DIME Test ID: 2019-09-03-12-2 CTM 521-June 2012 (Verified)
DIME Test ID: 2019-09-03-12-3 CTM 521-June 2012 (Verified)
DIME Test ID: 2019-09-03-12-4 CTM 557-July 2012 (Verified)
DIME Test ID: 2019-09-03-12-5 CTM 504-June 2010 (Verified)
DIME Test ID: 2019-09-03-12-6 CTM 533-June 2010 (Verified)