Sample Record
Owner Lab
- CT HQ - QASI Los Angeles Field Office
DIME Sample ID 2019-05-09-2
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 213569 DEA: 024F2104 EFIS: 0212000072 |
---|---|
DIST-CO-RTE-PM | 02-MOD-299-0.5/1.0 |
Award Date | 12/20/2018 |
Closeout Date | 11/15/2021 |
Work Description | Butte and Ash Creek Bridge Replacement |
Location Description | Construction of Butte Creek Bridge and Ash Creek Bridge on Route 299 at Adin |
QA Service Level | 1 (Verified on 06/26/2019) |
Sample Information
Sample Taken Date | 05/09/2019 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/13/2019 |
Sample type | Quality Assurance | A brief description of the sample | Resistance Butt Welded Hoops |
The quantity of what the sample constitutes | 7 lots | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Russell | Last name of sampler or witnessed by | Lynch |
Title of sampler | QAI | Telephone number of sampler | 3609216934 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | RKR Steel Welding | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L96-075-19 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Rebar Heat Number(s) | 40832535 |
Hoop Manufacturer Lot Number(s) | Lots 1 thru 7 | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Size | 6 |
Diameter of Hoop | 1'-11" | Epoxy Coated | No |
Epoxy Coating Color | NA | Rebar Manufacturer | CMC |
Welding Company | RKR Steel Welding | Coating Standards | Uncoated |
Weld Type | Flash Welded |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2019-05-09-2-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-8 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-9 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-05-09-2-10 CTM 670-December 2013 (Verified)