Sample Record
Owner Lab
- CT HQ - Sacramento Hot Mix Asphalt Laboratory
DIME Sample ID 2019-01-04-25
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 01/04/2019 | Sample Unique Key | 25 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/10/2019 |
Sample type | Quality Control | A brief description of the sample | JMF 1/2 Aggregate Qualities |
The quantity of what the sample constitutes | 1 | From where was the sample collected | Source |
First name of sampler or witnessed by | David | Last name of sampler or witnessed by | Ruedi |
Title of sampler | Unknown | Telephone number of sampler | 9252603017 |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Vulcan Materials - Pleasanton | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Vulcan materials |
---|---|---|---|
Aggregate Size | 1/2 | Aggregate Source | Vulcan materials |
RAP Stockpile | Continuous | Stockpile Size (tons) | Unknown |
Reclaimed Asphalt Pavement Mix Number | Not set |
JMF Information
HMA Design ID | JMF3512-2019-67-Test | Date Created | 01/28/2019 |
---|---|---|---|
Submittal |
Show (8)
JMF3511-208-2019-69 Submittal In Progress| JMF3513-2019-68 JMF3511-208-2019-71 Submittal Completeness Review Failed| JMF3513-2019-70 JMF3511-208-2019-72 Submittal Completeness Review Failed| JMF3513-2019-71 JMF3511-208-2019-113 Submittal In Progress| JMF3513-2020-112 JMF3511-208-2020-220 Submittal In Progress| JMF3513-2020-194 JMF3511-208-2021-6 Submittal Accepted for Verification| JMF3513-2021-72 JMF3511-208-2021-8 Submittal Rejected For Use| JMF3513-2021-74 JMF3511-208-2021-16 Submittal Completeness in Review| JMF3513-2021-82 |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2019-01-04-25-1 AASHTO T30-15 (Verified)