Sample Record

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

DIME Sample ID 2019-02-11-2

Project Information

Project IdentifiersProject ID: 213442
DEA: 112E1504
EFIS: 1117000179
DIST-CO-RTE-PM11-SD-5-38.1/39.3
Award Date11/06/2017
Closeout Date09/20/2021
Work Description(ALTERNATIVE DELIVERY) WETLAND CONSTRUCTION
Location DescriptionNEAR STATE HIGHWAY IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 08/28/2018)

Sample Information

Sample Taken Date02/11/2019 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing02/13/2019
Sample typeQuality Assurance A brief description of the sample#6 Flash Welded Hoops
The quantity of what the sample constitutes230 From where was the sample collectedFabricator
First name of sampler or witnessed byArthur Last name of sampler or witnessed byPeterson
Title of samplerCT METS QA INSPECTOR Telephone number of sampler707-342-8602
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Rebar Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormL110 017-19 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)4082089
Hoop Manufacturer Lot Number(s)Lot 1 and Lot 2 Material Standard CodeASTM A706
Material Grade60 Rebar Size6
Diameter of Hoop2'-10" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerCMC Rebar
Welding CompanyCMC Rebar (Etiwanda) Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2019-02-11-2-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory02/19/2019Fred
Yes
02/26/2019Bar Broke; OK Necking
2019-02-11-2-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory02/19/2019Fred
Yes
02/26/2019Bar Broke; OK Necking
2019-02-11-2-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory02/19/2019Fred
Yes
02/26/2019Bar Broke; OK Necking
2019-02-11-2-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory02/19/2019Fred
Yes
02/26/2019Bar Broke; OK Necking
2019-02-11-2-5CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory02/19/2019Fred
Yes
02/26/2019Bar Broke; OK Necking
2019-02-11-2-6CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory02/19/2019Fred
Yes
02/26/2019Bar Broke; OK Necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-02-11-2-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-02-11-2-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-02-11-2-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-02-11-2-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-02-11-2-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-02-11-2-6 CTM 670-December 2013 (Verified)