Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2018-12-20-25
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 212910 DEA: 080K2914 EFIS: 0812000098 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-30.9/33.3 |
Award Date | 03/06/2018 |
Closeout Date | 09/04/2019 |
Work Description | LANE REPLACEMENT |
Location Description | SAN BERNARDINO COUNTY IN REDLANDS FROM ORANGE STREET UNDERCROSSING TO REDLANDS BLVD OFF-RAMP UNDERCROSSING |
QA Service Level | 1 (Verified on 05/02/2018) |
Sample Information
Sample Taken Date | 12/20/2018 | Sample Unique Key | 25 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/26/2018 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Dennis | Last name of sampler or witnessed by | Rodriguez |
Title of sampler | g3 quality technician | Telephone number of sampler | Unknown |
Laboratory sample identification | 987-11 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | security paving | Transportation Laboratory (TL) Number | 11 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | lean concrete base I 10 redlands EB right lane st Orange st |
Structure name | lean concrete base I 10 redlands EB right lane st Orange st |
Material Information
Material Type | Concrete | The concrete mix design number | 1419984 |
---|---|---|---|
The truck number from where the sample was collected | na | The batch plant ticket number from where the sample was collected | na |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | SECURITY PAVING |
A detailed description of where the material sample was collected | MIDLE OF LOAD | Where the material sample would have been placed if not sampled | lean concrete base I 10 redlands EB right lane st Orange st |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2018-12-20-25-1 ASTM C39-10 (Verified)